OKBUILD · A COMMERCIAL-PROJECT BRAND UNDER GEORGE BUILDING GROUP

One-Stop Building Materials Solutions for Commercial Projects

Send us your drawings, BOQ, or floor plan. We turn them into a coordinated material package, then manufacture, inspect, and ship it from China to your project site.

Send Your Drawings / BOQ See How We Work
127,000 m²
Manufacturing base in Foshan
100+
Design professionals across the group
3,000+
Global projects (group figures)
20+ Years
Group export experience

PROJECT TYPES

Solutions for Hotels, Apartments, Offices, and More

Start with the project type closest to yours.

Hotel guestroom with a built-in wardrobe, bed, and lounge chair

Hotel Projects

FF&E and materials for guestrooms, public areas, and back-of-house.

Apartment living room with an open kitchen and city view

Apartment Projects

Unit packages for repeated layouts and phased deliveries.

Office reception with a stone-clad desk and timber wall panels

Office Projects

Fit-out materials for reception, work areas, meeting rooms, and pantries.

Bright healthcare reception area with a long white counter

Healthcare Projects

Materials for patient rooms, treatment areas, and staff spaces, specified to your project requirements.

Resort lounge with a feature water wall and low seating

Resort Projects

Interior and outdoor materials for villas, suites, and public areas.

Open-plan townhouse living room with sofas and tall windows

Townhouse Projects

Repeatable packages for multi-unit townhouse and villa layouts.

BUILT FOR COMPLEX PROJECT PROCUREMENT

A Commercial Project Is a Set of Connected Decisions, Not a Shopping List

Drawings, approvals, production, and site deliveries all depend on each other. We start by closing the gaps that delay quotes or get copied into every room.

Unclear Project Scope

Missing quantities and conflicting drawing revisions delay accurate quotes.

We confirm quantities and current revisions before we quote.

Design-to-Product Gaps

A rendering shows how a room looks, not the dimensions, hardware, and clearances a factory needs to build it.

We coordinate technical details and finishes before production.

Errors Repeated at Scale

One wrong size or finish can repeat across every room or unit.

We agree on samples and reference standards first.

Unplanned Site Deliveries

Unlabeled goods, missing accessories, and poorly timed arrivals slow the site.

We plan packing and shipment groups around your site.

START FROM YOUR CURRENT PROJECT STAGE

Tell Us What You Have. We’ll Identify the Next Practical Step.

Your starting point decides what we review first.

PATH A · PLANNING AND DESIGN

You Have a Brief or Floor Plan

For owners and developers setting the material and interior direction.

  • Review room types, functional needs, and target standards
  • Set the design and material direction with your team
  • Identify the categories and decisions involved
  • Plan the next drawing, budget, and approval steps

YOUR NEXT MILESTONE

A preliminary design and material direction, plus a list of decisions still to make.

PATH B · PROCUREMENT AND PRODUCTION

You Have Drawings or a BOQ

For contractors, architects, designers, and buyers preparing to source fit-out materials and custom products.

  • Review quantities, dimensions, and drawing revisions
  • Check specifications and product interfaces
  • Match proposed materials to the intended standard
  • Define quotation and sample-approval requirements

YOUR NEXT MILESTONE

A defined supply scope ready for quotation and approvals.

WHAT THE ONE-STOP SERVICE COVERS

One Coordinated Package From Design to Shipment

We coordinate building materials, furniture, and fixtures for overseas commercial projects as one package. Approved drawings and samples stay attached to it from production through delivery. You choose the scope: selected categories, a room package, or a broader project package.

Design and Technical Coordination

Space planning, material palettes, and 3D visuals when needed, plus the shop drawings and interface details a factory needs. Our project design support works whether you start from a brief or from finished drawings.

Material Packages by Space

Products are grouped by room type, unit, building, or shared area, with comparable alternatives and their budget impact shown before you order.

Core Manufacturing

Furniture, cabinetry and architectural millwork, and aluminum doors and windows come from our core manufacturing base. Other categories are coordinated within the same supply and QC scope.

Samples and 1:1 Mock-Up Approval

For repeated room types, inspect a full-scale room before batch production.

Six-Gate Quality Control

Six inspection gates, from technical release to loading release, checked against the samples you signed off.

Packing and International Delivery

Packing, export documents, and international shipping, with FOB, CIF, DDP, or destination terms quoted per project.

PRODUCT CATEGORIES

1,500+ Product Options Across Ten Categories

Combine the categories your project needs into one package from one supplier. Categories made on our core manufacturing base are marked.

Have a BOQ or product list?

Send it, and we will map each item to these categories and list what still needs confirming.

HOW YOUR PROJECT MOVES FORWARD

Seven Stages With a Clear Decision at Every Handoff

Each stage ends with a record your team can check, so the next one starts from what was approved, not from an email thread.

01

Project Review

We confirm what needs to be supplied and list every open item in a scope matrix.

02

Design Coordination

Technical details are resolved and recorded in finish schedules and shop drawings.

03

Material Package

Each item is specified, compared with alternatives, and priced in an itemized quotation.

04

Samples and Mock-Up

Samples, or a 1:1 mock-up, set the standard for production.

05

Manufacturing

We release production against the approved drawings, samples, and quantities.

06

Quality Control

Inspections at six gates, with findings and corrections recorded.

07

Project Delivery

Goods are packed, labeled, and shipped with packing lists and export documents.

The stages, records, and timing for your order are set in the project agreement. See how our project services run day to day.

SAMPLE AND 1:1 MOCK-UP APPROVAL

Approve One Room Before It Is Repeated Across the Project

Build the room that repeats most, such as a hotel guestroom or apartment unit, as a project-specific 1:1 mock-up. Your team can then check how the selected products fit, look, and work together at full scale. Once approved, it sets the standard for batch production.

01

Confirm Design

Agree on plans, room type, scope, and checks.

02

Choose Materials

Review physical finishes, products, and hardware.

03

Build the Space

Assemble the agreed products at full size.

04

Inspect Together

Check dimensions, appearance, clearances, and workmanship.

05

Record Changes

Capture agreed changes and open items.

06

Sign Off

These records guide batch production.

A mock-up is optional and suits designs repeated across many rooms or units. Location, cost, scope, schedule, and sign-off are agreed before work begins. Other projects can use samples or first-piece approval.

Team reviewing a full-scale hotel mock-up guestroom and finishes

MANUFACTURING AND QUALITY CONTROL

Production Follows the Approved Project Standard

Manufacturing starts once drawings, samples, quantities, and terms are confirmed. Each gate, from technical release to pre-shipment checks, compares the order with those approvals while corrections are still practical.

GATE 01

Technical Release

Resolve drawing, dimension, material, hardware, and quantity issues before the production brief is released.

GATE 02

Sample / First-Piece Review

Compare the first output with the agreed reference before repeat production.

GATE 03

Incoming Material Checks

Verify substrates, materials, components, hardware, and visible finishes.

GATE 04

In-Process Inspection

Check key dimensions, assembly, repeated details, and finishes while adjustments are practical.

GATE 05

Pre-Packing Inspection

Review appearance, function, quantities, and accessories, and confirm open issues are closed.

GATE 06

Loading Release

Confirm labels, shipment groups, packaging, documents, and loading readiness.

Inspectors checking furniture, cabinetry, and packed goods during production

WHAT YOU CAN REVIEW

Progress updates, representative QC photos, findings, corrective actions, packing checks, and release records.

OKBuild building materials manufacturing and project center in Foshan, China

MANUFACTURING SCALE AND PROJECT SUPPORT

A Real Industrial Base Behind the Project Plan

Our manufacturing platform in Foshan, China, puts material selection, core manufacturing, quality control, and export coordination in one location. Your team can review full-scale products and settle technical details in one visit.

127,000 m²
Six-building industrial base
1:1
Project-specific mock-up capability

FREQUENTLY ASKED QUESTIONS

Questions Commercial Project Teams Ask Before Working With Us

Can you work with drawings from our own architect or designer?
Yes. We work from your appointed professionals’ drawings and coordinate materials, custom details, shop drawings, and samples against them.
Can we start before our design and BOQ are complete?
Yes. A floor plan or brief, with a target standard, rough budget, and timeline, is enough to start. We then identify the decisions needed before an accurate quote.
How are price and lead time set?
Both are confirmed in the quotation once scope, specifications, quantities, and samples are agreed. The final schedule depends on approval timing, production readiness, and shipping arrangements.
Do we have to buy every category through OKBuild?
No. The scope can cover selected categories, a room-based package, or a broader project package, with inclusions and exclusions agreed before quotation and ordering.
Can you deliver by building, floor, room type, or construction phase?
Yes, when those divisions are identified before packing. The final schedule depends on production readiness, shipping arrangements, and site requirements.
Do you handle local construction, installation, or statutory approvals?
Not automatically. Local engineering approval, statutory permits, site construction, and installation stay with your appointed project parties unless they are specifically contracted. Our core scope covers design and material coordination, manufacturing and supply, inspection, packing, and agreed international logistics.

START WITH YOUR PROJECT INFORMATION

Bring Us Your Drawings. We’ll Help Define the Supply Plan.

A floor plan is enough to start. Drawings, a BOQ, or a procurement schedule let us review in more detail.

HELPFUL TO INCLUDE

  • Project type, country, and stage
  • Floor plans, room schedules, drawings, or BOQ
  • Required categories and approximate quantities
  • Finish requirements and target standard
  • Budget range and key dates

WHAT HAPPENS NEXT

01

We review your drawings or BOQ and confirm the supply scope and open items.

02

You receive a clarified supply scope and a list of decisions to resolve before quotation.

03

We then define the quotation basis and sample-approval requirements.

Prefer chat? Message us on WhatsApp.

Discuss Your Project
PDF, Word, Excel, JPG or PNG, up to 10 MB.